Menu Close

Chromite Project Albania – Empire Mining Ltd

2010

Albania

  • Producing an in-house polygonal wireframe resource estimate (volume, tonnage and weighted average grade) of the shallow parts of the Thekna, Batra and Bulqiza Cr deposits in Albania.
A 3rd part control and verification by an Senior Expert of MircoMine Consultancy Service and sign off on the evaluation process and the in-house resource
  • report on the methodology, QA/QC, resource estimate and recommendations
Plan/proposal 1 for twin and in-fill drilling (verification of previous intercepts and model)
  • Plan/proposal 2 for drilling of extensionsProposal for twin and infill drilling to reach inferred and indicated resources according to JORC and NI43-101Upside potential (resources) that could be expected for 1 and 2 above; drilling meter per tonnageVerification and discussion on flaws of the existing model (previous and new interpretationGeological model of the Bater Cr deposit based on available historic data including maps and x-sections