1997
France
- management of all drilling and other geotechnical investigation methods for a highway (A89) between Egléton and Brive la Gaillarde.
- Up to 5 drill rigs simultaneously.
- Investigation included core drilling in-situ testing (Pressiometer testing, SPT) and water wells/ piezometer.